Pages

Saturday, March 20, 2010

Weather Update

Here is a shot of the radar at 10 this morning 03/20/2010



Chris

Fabric Part Duex

Kim and Gina went back to Foil to pick out some fabric, it was snowing a little out 6-10 inches. They were gone several hours and had to turnback on Highway 20 do to road conditions. Back at our home about 1:30 after leaving at 9:00. They picked several choices of fabric to go into the boat, photos below


Choice 1 for the dining area



Choice 1 for the births



Choice 2 for the galley area, girls want it to be fun and inviting so this is the final choice. Gina took fabric back to Chris and we will get the cushions finished in 30 days. I took a photograph of the birth fabric but has been lost on iPhone? Updates to happen soon.

Wednesday, March 17, 2010

Cushions delivered

Kim and I took the cushions to the boat to Foil, OK. to be recovered.





The car was packed and we made the short trip after dropping off Spencer at the Shumakers.






Here is a photo of "We do cushions" it's a large warehouse with a wood burning fireplace in the corner, the smoke was thick and I pray that our new cushions don't smell like burnt wood. The price was about 1/2 of what we were thinking.

EOF

Monday, March 8, 2010

Compass Delivered

USPS delivered the compass today, it's a used Ritchie SP-5 with a serial of 078 from ES Ritchie and Sons. The compass was packed in two boxes and wrapped in a tight trash bag. I was aware that the compass needed a rebuild and I got my paperwork ready to get the job done the right way.


Here is a shot of the compass before I removed the stailess cover and light.



You can see where the mineral oil has leaked out of the compass, there are some small scratches in the clear cover, there is a replacment sold for 54.00

I removed the two top screws and removed the light, it looks like someone had soldered the leads to the unit, I will replace the attachment back to spec's



Here the cover has been removed and the screws taken off the mounts, oil was leaking at the seal, the new o- ring cost 12.00. I then removed the top cover and removed all the oil.


Here you can see the screw to remove or replace the oil, the compass had been repaired before, a service sticker was attached to the base.



Here you can see the model number and serial.


I removed all the oil from the compass and cleaned the dial, the card, and ran new filtered oil over the parts cleaning small grit from the compass.



Here is the photo of the oil, it was dirty and needed to be cleaned and refilled.



More photos of the cover and base parts cleaned. I ordered a new o- ring and I will polish the glass with some micromesh ultra fine sandpaper and toothpaste.



Here is a photo of the base of the unit, cleaned and set in a box to polish.



Overall it will be a great buy. A new compass like this one runs 524.00 and 800.09 retail, I picked this one up for 75.00 plus shipping cost.

EOF

Monday, January 25, 2010

New Photos Uploaded

Click on KIM to see the new PHOTO'S

COLD - Kim is ready to get a blanket


Kimberli is soooooooo cold, we had a shot time at the boat to check on items before the snow storm. XMAS here we come. It's funny how time goes by it's almost Feb. 1st... Spring is right around the corner.

Tulsa Boat Show is the 1st thru the 7th - looking forward to some good idea, looking at plumbing, electrical and engine items - the boat is on her way to getting her bottom done. Clearwater Bay is putting on BottomKote Hard Fiberglass paint and it should give us another 4 to 5 years of good sailing. Time to invest in a mask and a snorkel.

New Compass


I am looking to replace the missing compass - Ritche SP-5C

E33 Exterior - Youtube Video

Kim, Spencer, and Jonathon went to the boat a couple of weeks ago. I spent about an hour cleaning the Galley sink with Comet. I put Jonathon to work wiping all of the dinette teak down with cleaner and then soaking the wood work with teak oil. The weather was sooooooo cold outside and we were there only a short amount of time.

Thanks to Jon for a great job of getting down and dirty, he was a great deck hand and moved about 7 bucket of water, keeping the area clean.

Spencer has his usual job of getting the wet and dry vac and cleaning the bilge area.



Interior of the Ericson 33 - Youtube video


Update .01A

Updated Slideshow at the right to show all photos of boat at this time. I plan to keep this area up to date with all photos of boat and current work completed.

Wednesday, December 30, 2009

New mate

Kim and I went to boxer rescue and adopted a new bowman, get it......... His name is Roscoe.




Chris

Late start

We went to the boat to measure the floor to be replaced, it was cold outside with allot of wind.




Chris

Friday, November 27, 2009

One more day

We spent the whole day at the Ericson, we have the forward v-birth totally clean with all of the mildew removed and all of the teak cleaned and then oiled . The main salon everything was removed and all hatches were opened up and cleaned. The port side has some water damage on the upper shelf and the teak liner at the windows, after looking at your photos I am looking to replace the wood with Formica. Everything again was cleaned with teak cleaner and then oiled really well. I also got part of the kitchen sink area cleaned back up, and was looking at the condition of the thru hulls and valves. The starboard side was just as bad as the port, muddobbers have several nest in rear areas and we had to scurb the teak several times to get the staining to remove. It really is starting to come together inside, the cushions have been removed and taken to our "interior seamstress" my wife sister. She has all the sewing stuff as she used to make high end childrens clothes. I still have allot to get done before removing the floor.

The best pizza in Oklahoma


Chris

Friday, November 20, 2009

Twins

There is a nice pair of transoms. The Ericson 33 vs the Olson 34. Check out the difference in the wine shaped aft section of the Ericson must be an IOR design rule. Two totally cool looking sailboats.


Chris

Thursday, November 19, 2009

Rigging




Attached is a image file I found on the Ericson website giving all the sizes and lenths of the standing rigging, running rigging, and sheets.




Chris


More exterior and interior photos from teh first day looking at her. I am going to have a fun day with the power washer.



















Here is the interior fabric work done by Ericson - Remember the 70's baby. The floor is soft in a couple of places and will need to be replaced. Finally a sailboat that has a true galley. I will be so excited to cook some eggs and bacon on the cooktop.

Interior we shall go...


The interior needs some updating as discussed in an earlier thread. Attached are some photos of the boat on the first day we looked at her.
Here is the shot looking forward in the galley, the mast has been leaking thru the boot, and running down the liner to the veneered teak located at the windows, this will be replaced or fixed.

Wednesday, November 18, 2009

The first Romance





The family took a day trip to see the boat for the first time three weeks ago. This was after talking the details out with the owners and moving forward on our agreement about the boat. The marina was in a great location, clean bathrooms and we could park right in front of the catwalk to the slips. Our other club you had to park a long distance away from the action and even further away from the docks. This should make life alot easier taking supplies to the boat or having to get stuff out of the car. Photos of the boat when we first arrived.





The deck was in good shape, standing rigging was in great condition, there was a scratch in tge gelcoat forward port, and some minor bootstrip marks on starboard. The transom has some damage starboard top that will need some glass work but nothing jumped out at us.



The top sides looked to be in good condition also, we knocked about looking for any soft spots or rot. There is one spot forward in front of the mast that looks like compression, i will check below to see what is attached.



The interior looked to be in fair condition, mildew was growing due to a wet sump, the cushions were all stacked, and all of the doors were open to allow fresh air.

Frabric- Sunbrella

Searched the Internet for several fabrics to restore the cushions in the cabin. We are looking at making the interoir pop, I would like something more today as the girls are looking at more of a nautical look. I am suggesting a doe skin color in a micro fiber, and the girls are looking into a sunbrella. The new cushions no matter what is picked will freshing up the interior. Below is the photo of the sunbrella.




Chris

Prints on order

Manual and Electric Builge Pumps
Ice Box System

Plumbing Details























































































I got my hands on the plumbing drawings from Ericson, an architects dream.














Chris

The Kickoff

We traveled up to the lake to get started on cleaning the interior of the boat, and do some general items before the winter months made it too cold outside. The drive is a little more than where our other boat, a Capri25 is stored


We have made the jump onto the new boat head on and have posted our Capri 25 for sale locally and thru sailing Texas site, I have her priced right and have 4 buyers interested in her. We got to the boat on a raining wet afternoon, and we started cleaning up the interior of the boat. She has been sitting for a while and needed a little TLC to make her shine. I was really suprized on how the teak cleaned up, and how the liner took a good beating thru the years. Day one of cleaning finished.

Chris

The Proposal


Welocome to our Ericson 33 blog. We have become 1/2 owner of an Ericson 33 designed by Ron Holland. Last weekend my wife and I got the proposal of our life, ownership of our 4 th sailboat, a true yacht. Welcome and enjoy our journey of cleaning, updating and sailing our new pride and joy.